The Broadway Subway line will…

Cost more to construct than allocated

  • Cost estimates are already three years out of date 
  • Estimates do not include the cost of trains or depot
  • Every skytrain project to date has gone over budget
  • Tunneling involves unanticipated costs and risks
  • Underground utilities are “discovered” during construction

Cost more to operate than budgeted

  • Operating cost for the Broadway Subway have never been released 
  • Every skytrain line that has been evaluated has exceeded estimated operating costs
  • The Broadway Subway will be operated by a private concessionaire that is not required to release data
  • The Broadway Subway will not be inter-operable with the Canada Line
  • Underground stations cost much more to operate than above-ground or ground level stations

Have additional costs for trains and depot

  • Neither trains nor depot have been included in the budgeted development cost